Thermo Roof is an ultra-high performance acrylic based thermal insulating and heat reflective coating containing low-density air-filled microvoids with high SRI value for use in concrete and metal structures thus increasing the comfort zone and energy-saving. Ideal for most critical applications like a roof, corrugated metal roof, asbestos and cement sheets, over pipelines to prevent condensation/sweating, steam pipelines for thermal insulation, solar heaters, railway coaches, oil & gas storage tanks etc.
Application Guideline
Surface Preparation for Concrete Roof:
- Brush away loose contamination on the substrate to be coated.
- Bio-wash for killing fungus where necessary
- Roughen surfaces by wire brush manually.
- All surfaces must be clean and free from latence, dust, dirt, oil and grease.
- Please check Moisture level and pH level in walls/roof/terrace/ceilings. The moisture level should be below 12% and pH should be in the range 7-9.
- For Metal use ULTRACORR ZPP as a anti corrosive primer prior to application of THERMO ROOF paint.
Precautions:
- Do not apply when concrete surfaces or ambient temperatures are below the dew point.
- Material and the substrate temperature should be above 100C and below 500C before use
- Application on direct sunlight and windy situation may affect the paint performance
Mixing & Application:
Thoroughly mix the contents of containers
Thinning/Dilution of the material using water is not recommended.
Stir the paint occasionally before each use.
In case of concrete surface should be moist/water wash before application. However avoid puddling/ponding of water.
For Metal use ULTRACORR ZPP as an anti-corrosive primer prior to application of THERMO ROOF PAINT
Apply first coat with brush on the cleaned and washed surface.
Apply second coat after a gap of 1-2 Hours.
After completion of full coating, it should be allowed to cure for 24 hrs. Drying time may vary due to temperature / humidity and surface condition.
Ensure that the coated area does not come in contact with water for at least one hour.
Apply with a quality brush, or roller.
After completion of full coating, it should be allowed to cure for 24 hrs.